Wylfa site

Wylfa is located on a 21 hectare site on the north coast of Anglesey, and was the final and most powerful Magnox power station to be built. Operating from 1971 until 2015, it was unique within the Magnox fleet as the only station constructed without a spent fuel cooling pond.

Decommissioning began in 2020 following the completion of reactor defueling, and significant progress has since been made across the site. To date, 44 buildings have been demolished, two major asbestos removal projects have been completed, intermediate-level waste has been cleared from Dry Store Cell 4, and new waste management infrastructure, including a skip compound and waste clearance facility, has been established.

Among the site’s key decommissioning milestones was the permanent shutdown of the reactor ventilation and airflow systems in 2025, which simplified long-term operations, removed hazardous substances such as glycol and refrigerant gases from use, and is expected to save around £130,000 annually in energy costs. Work is now underway to isolate the turbine hall through the air-gapping of pipework and cabling ahead of future demolition, while a major upgrade to the site’s electrical distribution network is also progressing.

What makes Wylfa particularly distinctive is not only its status as the largest station in the Magnox fleet, but also its innovative decommissioning programme, which continues to deliver major environmental, operational and cost-saving benefits as the site moves closer toward its restoration goals.

Find out more

Use our interactive tool to find out more about the future of Wylfa site

In pictures

Key facts

Construction began

Generation started

Generation ended

total output Terawatt hours

Defueling started

Defueling completed

Decommissioning started