The next Dungeness A SSG meeting is on Thursday 4 February 2027
Meeting guidance
Dungeness A site
Dungeness A is located on a 20-hectare site at the southern tip of the Kent coastline, within one of Europe’s largest shingle landscapes. Construction of the twin-reactor Magnox power station began in 1961, with electricity generation commencing in 1965.
Over its operating lifetime, the station produced around 120 terawatt hours of electricity before generation ended in 2006. Defueling commenced in 2007 and was completed in 2012, with decommissioning activities progressing ever since.
Recently, the site completed a major engineering project to safely backfill the former turbine hall basement using more than 25,000 tonnes of material, creating a platform for the next phase of decommissioning. This achievement followed four years of preparatory work and represents a key step towards reducing the site’s footprint and transforming its appearance.
Current plans focus on the removal of the site’s eight boiler units, each weighing around 800 tonnes, together with associated infrastructure. Once complete, this flagship project will reduce Dungeness A’s building footprint by approximately one third and significantly reshape the skyline. Extensive preparatory work has already been undertaken, including the creation of a 39,000m2 demolition zone, equivalent to around seven football pitches.
What makes Dungeness A unique is its location within one of the UK’s most environmentally sensitive coastal landscapes. The site is surrounded by land designated as a Special Protection Area (SPA), Special Area of Conservation (SAC) and a Site of Special Scientific Interest (SSSI) and is home to rare species including the Sussex emerald moth and red hemp-nettle. Alongside decommissioning, NRS is working with environmental partners to create new habitats and enhance biodiversity, demonstrating how nuclear restoration and environmental conservation can progress hand in hand.
Find out more


Use our interactive tool to find out more about NRS decommissioning
In pictures












Key facts

Reactors

1961
Construction began

1965
Generation started

2006
Generation ended

120
total output Terawatt hours

2007
Defueling started

2012
Defueling completed

2015
Turbine Hall demolished

2019
Spent fuel storage ponds drained

0
hectares of land released for re-use