Hinkley Point A site
Hinkley Point A is located on a 19-hectare site on the Somerset coast, adjacent to both Hinkley Point B and the new-build Hinkley Point C station. Construction began in 1957, with the site’s two Magnox reactors entering service in 1965. During 35 years of operation, Hinkley Point A generated more than 103 terawatt hours of low-carbon electricity, setting a world record in 1988 when Reactor 2 operated continuously for 700 days and 7 hours. Generation ceased in 2000, defueling was completed in 2004, and decommissioning began shortly afterwards.
Since decommissioning started, the site has undergone significant transformation. Recently in 2026, a major milestone was reached when the site successfully produced and stored its first encapsulated concrete waste package, demonstrating a fully operational waste retrieval, treatment, encapsulation and storage route.
Today, decommissioning activities focus on retrieving, progressing and safely storing legacy intermediate-level radioactive waste while continuing to reduce hazards and prepare the site for future restoration.
Hinkley Point A now sits alongside both an operational AGR station and one of Europe’s largest nuclear construction projects. It is also recognised for achieving several firsts across the NRS estate, including the successful implementation of an integrated waste route and the safe storage of higher-activity waste packages, helping to shape decommissioning approaches across the wider nuclear sector.
Find out more


Use our interactive tool to find out more about NRS decommissioning
In pictures






Key facts

Reactors

1957
Construction began

1965
Generation started

2000
Generation ended

103
total output Terawatt hours

2000
Defueling started

2004
Defueling completed

2019
Turbine hall demolition