Sizewell A SSG
Sizewell A shares its Site Stakeholder Group meetings with Sizewell B. Meetings are held in person between three and four times each calendar year, and typically hosted mid-week and in the morning.
New members welcome
Interested in getting involved with the SSG? We’d love to hear from you. Please get in touch with the Secretariat to find out more. Details are available at Site Stakeholder Groups – Contact us.
SSG meetings
The next Sizewell A SSG meeting is on Wednesday 25 November 2026
Meeting guidance
Sizewell A site
Sizewell A is located on a 13-hectare site on the Suffolk coast near Leiston, adjacent to Sizewell B power station. Construction began in 1960 and the station’s two Magnox reactors started generating electricity in 1966, going on to produce more than 110 terawatt hours of low-carbon electricity during 40 years of operation, enough to meet around one-third of East Anglia’s electricity demand on a typical day. Generation ceased in 2006, defueling was completed in 2014/15, and decommissioning subsequently began.
Since then, numerous redundant structures have been removed, including the former National Grid switchgear building, carbon dioxide storage tanks, water treatment facilities and administration buildings. One of the site’s most significant recent milestones was the demolition of the turbine hall and associated structures in 2025, a landmark project which cleared an area the size of a professional football pitch and involved the largest use of explosives on a UK nuclear site for conventional demolition in decades. More than 17,000 tonnes of concrete and rubble were removed during the project, with 95% of demolition waste recovered for reuse or recycling.
Today, work continues to focus on hazard reduction, pond decommissioning, waste retrieval and long-term site restoration.
In pictures















Key facts

Reactors

1960
Construction began

1966
Generation started

2006
Generation ended

110
total output Terawatt hours

2006
Defueling started

2015
Defueling completed

1.2
hectares of National Grid yard land released for re-use

