Oldbury SSG
Due to their close geographical proximity, Oldbury shares its Site Stakeholder Group meetings with Berkeley. Meetings are held in person three times each year, and alternate between being hosted by the Oldbury SSG Chair at an Oldbury venue, and being led by the Berkeley SSG chair at a Berkeley venue. Meetings are typically mid-week and in the afternoon.
New members welcome
Interested in getting involved with the SSG? We’d love to hear from you. Please get in touch with the Secretariat to find out more. Details are available at Site Stakeholder Groups – Contact us.
SSG meetings
The next Oldbury SSG meeting is on Wednesday 24 February 2027
Meeting guidance
Oldbury site
Oldbury is located on a 39-hectare site on the banks of the River Severn in South Gloucestershire. The twin-reactor Magnox power station generated electricity between 1967 and 2012, producing a total of 137 terawatt hours during its operational life.
Following the completion of defueling in 2016, the site entered it’s decommissioning phase and has since focused on hazard reduction, waste management and preparing the site for its long-term future.
Significant progress has been made across the site, with numerous redundant facilities demolished or removed, including the Oldbury Technical Centre (OTC), a six-building complex which served as the UK’s centre of nuclear training excellence from the 1970s, and whose demolition in 2025 cleared almost 5,000 square metres of land for future reuse.
What makes Oldbury particularly distinctive is its role in pioneering innovative waste management techniques. The site is preparing for the deployment of the AutoSAS project, which will use advanced robotics to remotely sort and segregate radioactive waste, marking the first time this technology will be used on a UK nuclear site.
Find out more


Use our interactive tool to find out more about the future of Oldbury site
In pictures


















Key facts

Reactors

1961
Construction began

1967
Generation started

2012
Generation ended

137
total output Terawatt hours

2012
Defueling started

2016
Defueling completed